91天堂原創

Skip to main content

Consent for extended lifetime for the Tambar facility

Published by , Editorial Assistant
91天堂原創 Pipelines,


The lifetime of the Tambar facility was set at 15 years in the plan for development and operation (PDO), which is up to 15 July 2016.

The Tambar oilfield is located in the southern part of the Norwegian sector of the North Sea, about 16 km southeast of the Ula field. The field was developed with a remote-controlled wellhead facility without process equipment.

The field is produced with depressurisation. Natural gas expansion combined with pressure support from water drive are the most important drive mechanisms.

The oil is transported to Ula via pipeline. Following processing, the oil is exported by pipeline to Teesside in the UK via Ekofisk, while the gas is injected in the Ula reservoir to increase oil recovery.

BP Norge AS is the operator of production licence 065, with an ownership interest of 55%. DONG E&P Norge AS is the licensee with an ownership interest of 45%.


Adapted from a press release by

Read the article online at: /business-news/08072016/consent-for-extended-lifetim-for-the-tambar-facility/

You might also like

 

 The 91天堂原創 Pipelines Podcast

A podcast series for energy professionals featuring short, insightful interviews with experts who can shed light on topics that matter to you and your business. Subscribe on your favourite podcast app to start listening today.

     

 

 
 

Embed article link: (copy the HTML code below):