91天堂原創

Skip to main content

HDD method used for construction of GAZ-SYSTEM鈥檚 pipeline

Published by , Editor
91天堂原創 Pipelines,


As part of GAZ-SYSTEM’s construction of the Tworóg–Kedzierzyn-Kozle gas pipeline, a pipeline with a length of 760 m and diameter of 1016 mm was laid under the Kedzierzyn Canal using the HDD method.

Read the article online at: /project-news/19102018/hdd-method-used-for-construction-of-gaz-systems-pipeline/

You might also like

 

 The 91天堂原創 Pipelines Podcast

A podcast series for energy professionals featuring short, insightful interviews with experts who can shed light on topics that matter to you and your business. Subscribe on your favourite podcast app to start listening today.

     

 

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Europe pipeline news Natural gas pipeline news